OUR SERVICES

Bathroom refurbishments in Oldham and Greater Manchester

Stripped back and rebuilt, with the pipework and the floor sorted before anything is tiled.

Get a price for this job

Tell us what you want to do. No obligation either way.

Goes straight to Andrew John. No obligation, and your details are not passed on.

WHAT IT INVOLVES

What a bathroom refurbishment involves

Stripped back and rebuilt, with the pipework and the floor sorted before anything is tiled.

What you get

Stripped back to the walls and floor, the pipework and floor put right, then rebuilt.

The common failure

Not a leaking pipe. Water getting behind tiling because the board was ordinary plasterboard, or a shower tray on a floor with too much flex.

What moves the price

Layout changes. Keeping everything where it is makes for a straightforward job; moving the WC means moving the soil pipe.

Wood effect laminate meeting a tiled wet room floor on a flush, level threshold

IN THE QUOTE

What is in the quote

  • Strip out back to the walls and floor, and disposal
  • Any alterations to waste, supply and the floor structure
  • Moisture resistant boarding, and tanking where there is a shower
  • Floor build-up, levelling and the falls if there is a wet area
  • Tiling, second fix, sanitaryware and extraction
  • Making good and decoration outside the room where pipework has been chased

Bathrooms reward doing the boring parts properly. The board behind the tiles and the floor under the tray are the whole job.

HOW WE DO IT

How a bathroom job actually goes

Four steps, start to finish, so you know what happens and when.

  1. 01

    Tell us what you want in there

    A bath, a walk in shower, or both if the room takes it. A photo of the room from the doorway shows us more than measurements do.

  2. 02

    What is under the floor and in the walls

    Where the soil pipe runs decides where a WC can go, and the floor under an old bath is the thing that most often needs replacing before anything is tiled.

  3. 03

    A written quote with the fittings listed

    The work, and the fittings if you want us to supply them, priced separately so you can see both. Tiling is priced by what is actually being tiled rather than by the room.

  4. 04

    Stripped back and rebuilt properly

    Out to the walls, pipework and floor sorted, boarded and tanked where it needs it, then tiled and fitted.

THREE WAYS TO START

Talk to us about your bathroom

Whichever is easiest. You get the same answer from all three.

Or send it in a minute

Three boxes and a photo if you have one.

Goes straight to Andrew John. No obligation.

PAST WORK

Recent bathroom refurbishments

Photographs of his own work.

Large format wall tiles going up over the first fix pipework and waste
Large format wall tiles going up over the first fix pipework and waste
A finished bathroom with a close coupled WC, a two drawer vanity unit and black fittings
A finished bathroom with a close coupled WC, a two drawer vanity unit and black fittings
A level access walk in wet room with a black rainfall shower, grab rail and a tiled niche
A level access walk in wet room with a black rainfall shower, grab rail and a tiled niche
A finished bathroom with a quadrant shower, new WC and a wood effect floor
A finished bathroom with a quadrant shower, new WC and a wood effect floor
A fitted vanity unit with a mirrored cabinet above it
A fitted vanity unit with a mirrored cabinet above it
A quadrant shower enclosure finished in marble effect panelling
A quadrant shower enclosure finished in marble effect panelling
A shower over the bath with a glass screen and panelled walls
A shower over the bath with a glass screen and panelled walls
A bathroom finished with a bath screen, vanity unit and black fittings
A bathroom finished with a bath screen, vanity unit and black fittings
A bathroom with a heated towel rail, WC and vanity unit in place
A bathroom with a heated towel rail, WC and vanity unit in place

Call us for your bathroom quote

A written quote, itemised, with no obligation.

USEFUL TO KNOW

Bathroom questions

How long does a bathroom take?

A straightforward refit with the layout unchanged is usually a matter of days rather than weeks. Moving the soil connection or converting to a wet room adds to it because the floor has to come up. The dates go in the quote.

Can you turn our bathroom into a wet room?

Often, and the deciding factor is the floor. A wet room needs falls built into the floor and proper tanking, which is straightforward on a solid floor and more involved on a timber one. Both are possible and they are not the same price.

We only have one bathroom. What do we do?

It is worth planning around. Where it can be shortened by having materials on site before the strip out, it is, and you are told the realistic number of days rather than an optimistic one.

Is tiling straight onto plasterboard a problem?

In a shower area, yes. Ordinary plasterboard behind tiles in a wet zone is the single most common reason a bathroom fails after a few years. Moisture resistant board and proper tanking cost very little extra at the time and are the difference between a bathroom lasting five years and twenty.

GET A PRICE

Tell us about your job

Three boxes and a photo if you have one. We price it in writing, with no obligation.

Goes straight to Andrew John. No obligation.

Where we work from

Based in Oldham, covering Greater Manchester.