OUR SERVICES

Commercial refurbishments in Oldham and Greater Manchester

Shops, offices and units stripped and refitted, worked around whatever still has to trade.

Get a price for this job

Tell us what you want to do. No obligation either way.

Goes straight to Andrew John. No obligation, and your details are not passed on.

WHAT IT INVOLVES

What commercial work involves

Shops, offices and units stripped and refitted, worked around whatever still has to trade.

What you get

Shops, offices and units stripped out and refitted: partitions, ceilings, flooring, services alterations, decoration and making good.

The constraints are the difference

The building work is no harder than domestic. What has to stay open, what hours are workable and what the landlord must approve are.

Settle it before the strip out

Including the reinstatement obligation at the end of the lease, which is the one that surprises people.

A commercial unit being fitted out, with the slatted feature wall up and the floor going down

IN THE QUOTE

What is in the quote

  • A programme built around your trading hours, not around ours
  • Strip out and disposal, priced as its own stage
  • Partitions, ceilings, flooring and decoration
  • Alterations to services, coordinated with whoever is certifying them
  • Phasing, where the premises has to stay in use
  • What is excluded, particularly anything that needs a landlord's consent first

Commercial jobs are won and lost on the programme rather than the building. What has to stay open decides how the work is sequenced.

HOW WE DO IT

How a commercial refurbishment job actually goes

Four steps, start to finish, so you know what happens and when.

  1. 01

    Tell us what the unit has to become

    A shop, an office, a treatment room or a workshop, and whether you are trading through it. Photos of the space as it is.

  2. 02

    What the lease and the building allow

    What is structural, where the services are, what the landlord's conditions say, and what has to stay. The visit is about the constraints as much as the work.

  3. 03

    A written quote with the phasing in it

    Priced in stages and, where you are still trading, sequenced around your opening hours with the out of hours work shown separately so you can decide if it is worth it.

  4. 04

    Strip out, build, fit out

    Stripped back, partitions and services in, then finishes, so the dirty work is done and gone before anything that marks easily goes in.

THREE WAYS TO START

Talk to us about your commercial refurbishment

Whichever is easiest. You get the same answer from all three.

Or send it in a minute

Three boxes and a photo if you have one.

Goes straight to Andrew John. No obligation.

PAST WORK

Recent commercial refurbishments

Photographs of his own work.

A commercial unit stripped back, with the walls being made good
A commercial unit stripped back, with the walls being made good
The same unit painted and the new floor laid
The same unit painted and the new floor laid
A kitchenette fitted in a commercial unit, with a solid worktop
A kitchenette fitted in a commercial unit, with a solid worktop
The finished unit, painted through with a new door hung
The finished unit, painted through with a new door hung

Call us for your commercial refurbishment quote

A written quote, itemised, with no obligation.

USEFUL TO KNOW

Commercial questions

Can you work outside trading hours?

Where the job needs it, yes, and it is priced accordingly rather than quoted as normal hours and then queried. Say at the outset what hours you actually need protected.

Our landlord needs to approve the works. Does that hold things up?

It does if it is left late. A licence to alter takes as long as it takes, so the sensible order is to get the scope settled and submitted early and build the programme around the answer. It is worth flagging at the first conversation.

Do you do the electrical and mechanical certification?

No. Those are separate registered disciplines and those registrations are not held here, so nothing here offers them. The building work is coordinated around whoever is doing them, which works best when they are appointed early.

Can you phase the work so we stay open?

Usually yes, and it costs more than doing it in one go because the same area gets set up and cleared more than once. Whether that trade is worth it depends on what a closed week costs you, which is your number rather than ours.

GET A PRICE

Tell us about your job

Three boxes and a photo if you have one. We price it in writing, with no obligation.

Goes straight to Andrew John. No obligation.

Where we work from

Based in Oldham, covering Greater Manchester.